Skip to main content
Construction project delivery environment

00/EPPM · EverythingPM delivery platform · Early access

Plan the work. Control the delivery.

EPPM brings your programme, model, cost, progress and risk into one connected platform, so every update shows what moved, why, and what it affects — before it reaches site.

Construction scheduling · EverythingPM delivery platform

See the delay before it reaches site.

Programmes slip when design, logistics, resources and cost are planned in isolation. Bring your Primavera P6 programme in, compare every update with the baseline and see what moved, why, and what it affects.

Planned finish 11 Dec

OctNovDec
  • CR08 Construct core — Level 08
  • CL08 Columns — Level 08
  • SL08 Construct RC slab — Level 08
  • MS08 Level 08 structure complete
  • FP1 Facade install — Podium 1

Moved vs baselineBaselineData date 02 Nov

Example only · Dancing Twin Towers concept · early access

Start with what you already have

Your programme. Your model. Connected.

  • Primavera P6 programmes

    XER export

  • BIM models

    IFC (IFC2x3 and IFC4)

  • Cost data

    Excel or CSV template

  • Project documents

    PDF, drawings, Office files

How it works

From programme and model to decisions you can trust.

  1. 01

    Bring the programme and model together.

    Import your P6 programme and IFC model, then link model elements to activities by storey, type or a property that holds the Activity ID.

  2. 02

    Review every update before it counts.

    Each new programme is compared with the current one: what was added, removed or moved, and by how many days. Nothing is published, and the approved baseline is never overwritten, until someone reviews it.

  3. 03

    Keep cost, progress and risk next to the work.

    Approved site progress drives earned value. Risks and delay events are linked to the activities they affect, and every dashboard figure opens the records behind it.

Explore EPPM

Follow a project through every stage.

Each stage of EverythingPM's delivery approach maps to part of the platform. Try them with the Dancing Twin Towers example project.

Dancing Twin Towers · concept projectExample only · not live project data

Forecast finish 18 Dec · +7 days

OctNovDec
  • CR08 Construct core — Level 08
  • CL08 Columns — Level 08
  • SL08 Construct RC slab — Level 08
  • PT08 Post-tension stressing — L08
  • MS08 Level 08 structure complete
  • FP1 Facade install — Podium 1

Moved vs baselineBaselineData date 02 Nov

A crane outage moves the Level 08 slab pour by a week. The platform compares the update with the baseline, shows what moved and why, and keeps the approved baseline untouched.

Connected capabilities

The detail you need. The context that matters.

A common thread runs through planning, controls and BIM: the activities that describe how your project will be delivered.

Programme & baselines

P6 import, revision comparison, approved baselines and a Gantt view with critical and near-critical activities.

BIM & 4D status

Browser-based IFC viewer with elements coloured by delivery status at any date, and element-to-activity links.

Cost & earned value

Control budget, cost-loaded programmes, commitments and actuals, with PV, EV, CPI, SPI and estimate at completion.

Site progress

Progress with photos and quantities from site, reviewed and approved before it changes the official position.

Risk & change

Risks, early warnings, compensation events and delay events linked to the activities they affect.

Documents

Document register with ISO 19650 revisions and suitability codes; uploading is kept separate from authorising.

Dashboards & reporting

Portfolio and project dashboards, filterable by contractor or WBS, with monthly snapshots and drill-through.

Activity 360

Everything about one activity in one place: logic, dates, cost, progress, model elements, risks and documents.

Built for controlled project data

Commercially sensitive information, handled properly.

  • Each organisation's data is separate

    Isolation is enforced by the database itself, not just the application.

  • A tamper-evident audit trail

    Every material change records who made it, when and why.

  • Role-based access

    From project directors to subcontractors: people see and change only what their role allows.

FAQ

About EPPM.

01Is EPPM available now?

EPPM is in early access and in active development. You can create an account and explore it with the Dancing Twin Towers example project, then bring your own programme and model.

02What can I import?

Primavera P6 programmes (XER), IFC models (IFC2x3 and IFC4), cost data using our Excel or CSV template, and project documents such as PDFs and drawings.

03How does EPPM relate to EverythingPM's services?

EPPM is built by EverythingPM, an integrated project delivery company, from the same approach we use on projects: connecting design, construction planning, project controls and digital delivery. You can use it on its own or alongside our delivery support.

04Does it replace Primavera P6 or our BIM tools?

No. EPPM works with the programme and models you already produce, connecting them with cost, progress, risk and documents rather than replacing specialist authoring tools.

Get started

See your next project take shape.

Create an account to explore EPPM with example data, or talk to us about using it on your project.